Practice with real exam-pattern questions for Infosys Certified SAP APO PPDS Professional Consultant. Each question includes a detailed explanation to help you understand the concept, not just memorise the answer. Try 10 questions free — no login required.

BeginnerSAP60 min
Free questions

10 Infosys Certified SAP APO PPDS Professional Consultant practice questions with answers

Real Lex exam-pattern multiple-choice questions for the Infosys Certified SAP APO PPDS Professional Consultant certification. Each question includes the correct answer. The full question bank is available to Premium members.

  1. Question 1

    The Last Lot Exact setting on the Lot Size tab of the material master is checked. The Lot size setting is fixed lot with 100 Ea. What will be the result of running a SAP_PP_002 heuristic in case the demand is 80 and in another case the demand is 144?

    • Receipts created will be for 100 Ea and 200 Ea respectively Correct
    • B Receipts created will be for 80 Ea and 200 Ea respectively
    • C Receipts created will be for 100 Ea and 144 Ea respectively
    • D 3 Receipts of 100 each will be created
  2. Question 2

     What is the purpose of the finiteness level setting in PPDS

    •  There are various levels of finite planning possible between fully finite and infinite planning. Finiteness Level indicates what amount / level of finite scheduling is to be done by PPDS Correct
    • B  There is no such setting for finiteness level
    • C  It is used to decide which heuristics / profiles should do finite planning and which ones should do infinite planning based on the setting in the heuristics and in the resource
    • D  Finiteness level is only applied to the resource to indicate whether it is finite or infinite
  3. Question 3

     Please highlight the correct statement regarding PPDS horizons

    •  PPDS plans within the PPDS horizon and the planning time fence is ignored as it is relevant to SNP Correct
    • B  PPDS plans within the planning time fence but outside of the PPDS horizon
    • C  PPDS Plans within the PPDS Horizon but does not plan before the planning time fence (PTF) as it is a frozen horizon. Planner can manually create receipts in PTF
    • D  PPDS Plans within the PPDS Horizon but does not plan before the planning time fence (PTF) as it is a frozen horizon. Planner CANNOT manually create receipts in PTF as it is a frozen zone.
  4. Question 4

     If a resource is to behave finitely for certain planning purposes and infintely for others, the corresponding _____ must be defined, both in the ____ and in the _____

    •  strategy , resource , product Correct
    • B finiteness level, resource, strategy
    • C  heuristics, strategy, product
    • D  horizon, product, resource
  5. Question 5

     Typical examples of materials which have BOM but no routings are

    •  By- products Correct
    • B  Phantoms
    • C  Co-products
    • D  Assemblies
  6. Question 6

     The indicator :Can be used by several operations: is not set for a particular resource. which of the following is true in this case

    •  Several operations may use the capacity of this resource Correct
    • B  A 500Ltr tank contains 50 ltr of water may not hold any other liquid at the same time.
    • C  All operations can be scheduled on the resource
    • D  There is no such indicator on the resource
  7. Question 7

    What is the key difference in planning with SNP vs PPDS?

    •  SNP is long term whereas PPDS is short term Correct
    • B  SNP does bucketed planning whereas PPDS does time continous
    • C  Both of the above
    • D  None of the above is true SNP and PPDS both are short term planning
  8. Question 8

     When you have the "Consider order relationship" and you reschedule the order/ operation then the following happens

    •  Only the corresponding order/operation will be rescheduled and the dependent operations will not be rescheduled Correct
    • B  the corresponding order/operation will be rescheduled and the dependent operations also will be rescheduled
    • C  No rescheduling will happen
    • D  Rescheduling with error logs
  9. Question 9

     What would be the quantity of the planned orders generated in the following scenario: Total requirements is 50 quantity, Stock in Hand is 10 Quantity, Projected available is 10 Quantity

    •  40 Correct
    • B  50
    • C  30
    • D  20
  10. Question 10

     Planning procedure of 1 means

    •  Manual with Check. Planned order for header product will get created only if sufficient receipts for component are present to make the required qty of header product Correct
    • B  Manual without Check. Planned order for header product will get created irrespective of whether or not adequate component receipts are present
    • C  There is no such planning procedure
    • D  Planning in planning run. 1 is the default standard planning procedure to enable planning of products in planning run
Pricing

Pay once. Clear every cert this year.

One subscription, full Telegram channel access, every PDF posted during your membership.

Monthly
50% OFF
₹1,300₹2,600
Per month · cancel anytime
  • Full access to all 1,357+ certifications
  • Monthly updated question banks
  • Telegram private channel access
  • Cancel anytime
Get Monthly
POPULAR
Quarterly
44% OFF
₹1,800₹3,200
That's ₹600/mo · billed for 3 months
  • Everything in Monthly
  • Save ₹2,100 vs monthly billing
  • Priority answer key requests
  • Best for increasing DQ score fast
Get Quarterly
BEST VALUE
Lifetime
52% OFF
₹2,400₹5,000
One-time · lifetime access
  • Everything in Quarterly
  • Lifetime channel access — no renewals
  • All future certifications included
  • Priority response from admin team
Get Lifetime
FAQ

Common questions, straight answers.

A monthly-updated Telegram channel where we post real exam-pattern question banks and detailed answer keys for 1,357+ Infosys Lex certifications. You join once, you get every PDF posted during your membership.

Right after payment on our Graphy page, you'll receive a private invite link to the Telegram channel. Access is instant — usually under 30 seconds.

We compile question banks from the actual Lex test pattern, sourced and verified by 180K+ community members who've recently cleared these exams. Match rate is consistently 85–95%.

Every single month. When Infosys rolls out new versions of certifications, we post updated dumps within 7–10 days. You'll see channel activity weekly.

Clearing certifications is one of the highest-weighted DQ factors. Members typically clear 3–5 certifications in their first 3 months, which moves DQ scores up by a full band.

i
InfyLexDumps

Independent exam preparation platform for Infosys Lex certifications. Real exam-pattern question banks, monthly updates, 180K+ community members.

Join Premium Telegram
Contact
  • @prepflixadmin
  • admin@prepflix.net
This platform is an independent educational resource and is not affiliated with or endorsed by Infosys Ltd. All certification names referenced are property of their respective owners.
© 2026 InfyLexDumps
Join Premium Telegram